{"id":103,"date":"2014-06-02T15:24:09","date_gmt":"2014-06-02T15:24:09","guid":{"rendered":"http:\/\/getaway.abusinessstrategy.com\/?page_id=103"},"modified":"2014-06-26T01:36:05","modified_gmt":"2014-06-26T01:36:05","slug":"construction-bidding","status":"publish","type":"page","link":"http:\/\/getaway.abusinessstrategy.com\/?page_id=103","title":{"rendered":"Construction Bidding"},"content":{"rendered":"<p>[et_pb_section][et_pb_row][et_pb_column type=&#8221;2_3&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;left&#8221;]<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-large wp-image-378\" src=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-Pg-Hed-1024x409.jpg\" alt=\"Const bid Pg Hed\" width=\"1024\" height=\"409\" srcset=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-Pg-Hed-1024x409.jpg 1024w, http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-Pg-Hed-300x120.jpg 300w, http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-Pg-Hed-1080x432.jpg 1080w, http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-Pg-Hed.jpg 1500w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><br \/> \u00a0<br \/> <a href=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-copy-pic-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-380 size-full\" src=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-bid-copy-pic-1.jpg\" alt=\"Const bid copy pic 1\" width=\"200\" height=\"250\" \/><\/a>M.W. Mielke, Inc. knows construction bidding. In fact, we go the extra mile in developing our capabilities and expertise in the pre-construction estimating process. Our internal team of estimators is high qualified to provide precise takeoffs, estimates and bills-of-materials for most construction projects.<\/p>\n<p>Our extensive knowledge of the construction industry, the bidding process and building systems provides general contractors, engineers, construction firms, and building owners with a partner who can easily, accurately, and consistently produce bids that increase project wins.<\/p>\n<p>M.W. Mielke, Inc. estimators use state-of-the-art estimating software programs that provide precise takeoffs and material costs. Our experience in the bidding process is an asset to our customers because of our extensive knowledge of construction, building systems and contracting processes. Don\u2019t let your next bid slip away!<\/p>\n<p>Contact M.W. Mielke, Inc. Construction Bidding today.<\/p>\n<p>Email us directly at: <a href=\"mailto:estimator@mwmielke.com\">Estimator@MWMielke.com<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_3&#8243;][et_pb_sidebar admin_label=&#8221;Sidebar&#8221; orientation=&#8221;left&#8221; area=&#8221;sidebar-1&#8243; background_layout=&#8221;light&#8221; \/][\/et_pb_column][\/et_pb_row][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;left&#8221;]<\/p>\n<h2><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-417\" src=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/line2.png\" alt=\"line\" width=\"1086\" height=\"11\" srcset=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/line2.png 1086w, http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/line2-300x3.png 300w, http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/line2-1024x10.png 1024w, http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/line2-1080x10.png 1080w\" sizes=\"auto, (max-width: 1086px) 100vw, 1086px\" \/><\/h2>\n<h2>Construction Bidding Project Studies<\/h2>\n<p>M.W. Mielke, Inc. understands the difference between a winning and losing bid. Our experience in working with general contractors, engineers, construction firms, and building owners during the bid process has resulted in many bid award contracts including:<\/p>\n<p>\u00a0<\/p>\n<table>\n<tbody>\n<tr>\n<td bgcolor=\"#dbdbdb\" width=\"312\">\n<h4 style=\"text-align: center;\"><strong>Steam Condensate Receiver Installation<\/strong><\/h4>\n<p><a href=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-Proj-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-146 aligncenter\" src=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-Proj-1.jpg\" alt=\"Const Proj 1\" width=\"300\" height=\"200\" \/><\/a><\/p>\n<\/td>\n<td bgcolor=\"#dbdbdb\" width=\"312\">\n<p><strong>Objective<\/strong>: Ohio State University required the installation of a new steam condensate receiver at the OSU medical center facility.<\/p>\n<p><strong>Solution<\/strong>. M.W. Mielke, Inc. provided the system expertise and installation of the new receiver as part of a larger central boiler project<\/p>\n<p><strong>Results<\/strong>: The work was completed on time with no disruption or downtime for the medical center.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<h4 style=\"text-align: center;\"><strong>Army Base Boiler Installation<\/strong><\/h4>\n<p><a href=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-Proj-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-147 aligncenter\" src=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-Proj-2.jpg\" alt=\"Const Proj 2\" width=\"300\" height=\"200\" \/><\/a><\/p>\n<\/td>\n<td width=\"312\">\n<p><strong>Objective<\/strong>: A Federal army base required a new boiler installation for the facility.<\/p>\n<p><strong>Solution<\/strong>: M.W. Mielke, Inc. was contracted to install the new boiler equipment along with fuel piping, vent piping and HW piping.<\/p>\n<p><strong>Results<\/strong>: Installation of state of the art boilers to increase overall efficiency and save energy.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td bgcolor=\"#dbdbdb\">\n<h4 style=\"text-align: center;\"><strong>HVAC and Plumbing at Ft. George Stewart<\/strong><\/h4>\n<p><a href=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-Proj-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-148 aligncenter\" src=\"http:\/\/getaway.abusinessstrategy.com\/wp-content\/uploads\/2014\/06\/Const-Proj-3.jpg\" alt=\"Const Proj 3\" width=\"300\" height=\"200\" \/><\/a><\/p>\n<\/td>\n<td bgcolor=\"#dbdbdb\" width=\"312\">\n<p><strong>Objective: <\/strong>The new construction of the WIT administration building at fort Stewart George required extensive HVAC and plumbing throughout the building.<\/p>\n<p><strong>Solution: <\/strong>M.W. Mielke, Inc. was contracted for their expertise in providing all HVAC and plumbing installation for the new building.<\/p>\n<p><strong>Results<\/strong>: Installation was completed on time and budget to the satisfaction of the client and GC.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section][et_pb_row][et_pb_column type=&#8221;2_3&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;left&#8221;] \u00a0 M.W. Mielke, Inc. knows construction bidding. In fact, we go the extra mile in developing our capabilities and expertise in the pre-construction estimating process. Our internal team of estimators is high qualified to provide precise takeoffs, estimates and bills-of-materials for most construction projects. Our extensive knowledge of the construction [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-103","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=\/wp\/v2\/pages\/103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103"}],"version-history":[{"count":44,"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=\/wp\/v2\/pages\/103\/revisions"}],"predecessor-version":[{"id":418,"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=\/wp\/v2\/pages\/103\/revisions\/418"}],"wp:attachment":[{"href":"http:\/\/getaway.abusinessstrategy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}